Reports

Reporting
The reporting functionality is located under the Reports menu. The main reporting sections are Standard Reports, Scheduled Reports, Saved Reports, and System...
Fri, Dec 13, 2019 at 10:22 AM
Standard Reports
Standard Reports is located under Reports-->Standard Reports (see figure 28.1).  Figure 28.1. Standard Reports
Fri, Dec 13, 2019 at 10:22 AM
Running a Report
To run a report, you must select the output format    for that report. There are five main output formats for reports: HTML Reports HTML Reports display t...
Fri, Dec 13, 2019 at 10:23 AM
Saved Reports
You can save the output of a report with a fixed date range for later viewing. Saved reports can also be copied to other users or even emailed to other indi...
Fri, Dec 13, 2019 at 10:23 AM
Scheduling a Report
Scheduled reporting is located under Reports->Scheduled Reports (see figure 28.4). You can schedule reports to run automatically at specific times. This...
Fri, Dec 13, 2019 at 10:24 AM
System Reports
System Reports are located under Reports->System Reports (see figure 28.5). The system incorporates the ability to run reports on individual aspects of y...
Fri, Dec 13, 2019 at 10:24 AM
Creating a New Report
The product ships with a number of default reports that should fit the needs of most users and organizations. However, Journyx also includes a complete suit...
Fri, Dec 13, 2019 at 10:24 AM
Line Item Reports
  Figure 28.13. Line Item Options Line Item reports provide you with the ability to show the details associated with the individual time, expense, and c...
Fri, Dec 13, 2019 at 10:25 AM
Matrix Reports
     Figure 28.14. Matrix Report options Matrix reports provide a cross-reference style report that resembles a matrix. The options specific to Matrix R...
Fri, Dec 13, 2019 at 10:25 AM
Project Status Reports
 Figure 28.15. Project Status Report Options Project Status Reports provide project status overviews with data rolled up from tasks to the project lev...
Fri, Dec 13, 2019 at 10:26 AM